New ATC tower equipment goes operational at Iraqi air bases
The procurement, integration, testing, and installation of the new equipment was carried out by Arinc Engineering Services of the USA. The new technology allows Iraq’s Air Force to establish efficient operational control with modern equipment in the towers at the two airbases, as part of the rebuilding of Iraq. Arinc performed the work under a US Air Force Foreign Military Sales (FMS) contract, awarded by the USAF Electronic Systems Center (ESC) Aerospace Management Systems Division.
See the full article at Arabian Aerospace